Set Project Available Resources
Use this option when you want to narrow the list of resources that can be assigned to work packages.
- Select . The Manage Projects tab window displays.
- Click on the dropdown in the Ribbon Menu and select the project you want from the list.
- Select the Structures tab.
- Click . The Set Available Resources window displays.
- Expand the resource structure hierarchy as needed.
-
Click on the check box for each resource you want to include as an available resource.
Tip:
Clicking a resource structure summary level check box selects all the related child resources. You can change your available resource settings at any time.
- Click to return to the Structures tab
- Click in the Ribbon Menu.
- Optional. Close the Manage Projects tab.